Jurong Aracruz Shipyard (EJA) has surpassed a significant operational milestone with the completion of its first floating oil and gas production, storage and offloading (FPSO) project. The P-68, a newly built FPSO platform, left the shipyard on Monday (17) and will be deployed in the ultra-deepwater Berbigão and Sururu fields in the Santos Basin, Brazil.
The vessel was built for Tupi BV, a consortium formed by Petrobras Netherlands BV (“PNBV”), Total Brazil Services BV, BG Gas Netherlands Holdings BV (“Shell”) and Galp Sinopec Brazil Services BV (Petrogal).
Measuring 316 meters long and 54 meters wide, the P-68 will produce up to 150.000 barrels of oil per day (BOPD). It has a storage capacity of 1,6 million barrels and can accommodate 154 people.
EJA’s scope of work on P-68 includes the fabrication of six modules, pipe racks and flare, and their integration into the vessel along with other items supplied by the client. Carryover work was also carried out on the FPSO hull, which was built by another shipyard.
The Jurong Aracruz Shipyard, in addition to exploring the local oil and gas industry, is strategically located on the east coast of Brazil and is capable of serving fields under exploration in the Atlantic, Gulf of Mexico and West Africa regions.
EJA President T. Guhan states that “As a Brazilian shipyard with international experience and advanced capabilities, we are a large economic organization and also part of the social and economic fabric of Espírito Santo and its local communities.”
After P-68, EJA will complete the P-71 FPSO module manufacturing and integration project for Tupi BV
Source: ESBrasil
